FAA-PMA-Approval;

U.S. Department

Transport Airplane Directorate

of Transportation

Aircraft Certification Service

 

Seattle MIDO

Federal Aviation

2500 East Valley Road,  Suite C2

Administration

Renton, WA 98055-4056

 

Cessna's below:

April 27, 2005                        NOT FOR REPRODUCTION

 Mr. Mike Peter

Avtek

25230 45th Ave S

Kent, WA  98032

 Dear Mr. Peter:

 FEDERAL AVIATION ADMINISTRATION - PARTS MANUFACTURER APPROVAL

 In accordance with the provisions of Title 14 of the Code of Federal Regulations (CFRs) part 21,

Subpart K, we have found that the design data, submitted by Avtek based on Test & Computations, and application letter dated April 19, 2005, meet the airworthiness requirements of the regulations applicable to the products on which the parts are to be installed.  Additionally, it has been determined that Avtek has established the fabrication inspection system required by part 21 § 21.303(h) at 25230 45th Ave S Kent, WA  98032.  Accordingly, Parts Manufacturer Approval (PMA) is hereby granted for production of the replacement parts listed in the enclosed Supplement No. 3.  For Cessna Aircraft Models.

 You are reminded that the provisions of the Federal Aviation Regulations, noted in our PMA letter of approval dated September 5, 2002, also apply to the enclosed PMA Listing-Supplement No. 3.  The enclosed Supplement should be retained with the original PMA Letter as evidence of approval to produce the parts concerned.

 Sincerely,

 James S. Masciotra, PI

Seattle Manufacturing Inspection District Office

 Enclosure:

  PMA Supplement No. 3

 FEDERAL AVIATION ADMINISTRATION - PARTS MANUFACTURER APPROVAL

                       

Piper's below:

FAA-PMA-Approval Dec 15 2004

u.s. Department of Transportation

Federal Aviation Administration

Transport Airplane Directorate Aircraft Certification Service

1601 Lind Avenue S.w. Renton, Washington 98055-4056

DEC I 5 2004

In Reply

Refer To: 150S-04-508

Mr. Michael Peter AvTek Co:25230 45th Ave S. Kent, W A 98032

Dear Mr. Peter:

This is in response to your letter, dated November 25,2004, requesting Parts Manufacturer Approval (PMA) on AvTek door-seal part number Aero-PMA 1001, which is eligible for installation on the Piper Aircraft Models.

We have reviewed the drawings and data submitted and find they meet the requirements of 14 Code of Federal Regulations 21.303(d)(1). The approval of the design via the PMA supplement along with your application has been forwarded to the Seattle Manufacturing Inspection District Office (MIDO). Production approval will be granted after the validation of your fabrication inspection system, and issuance of the FAA-PMA letter and PMA supplement by the MIDO.

Sincerely,

Dor M Anderson                NOT FOR REPRODUCTION

For Jeffrey E. Duven

Manager, Seattle Aircraft Certification Office

December 27, 2004

 Mr. Mike Peter

AvTek

25230 45th Ave S

Kent, WA  98032

 

Dear Mr. Peter:

 

FEDERAL AVIATION ADMINISTRATION - PARTS MANUFACTURER APPROVAL

In accordance with the provisions of Title 14 of the Code of Federal Regulations (CFRs) part 21,

Subpart K, we have found that the design data, submitted by Avtek based on Test & Computations, and application letter dated December 23, 2004, meet the airworthiness requirements of the regulations applicable to the products on which the parts are to be installed.  Additionally, it has been determined that Avtek has established the fabrication inspection system required by part 21 § 21.303(h) at 25230 45th Ave S Kent, WA  98032.  Accordingly, Parts Manufacturer Approval (PMA) is hereby granted for production of the replacement parts listed in the enclosed Supplement No. 2.

 You are reminded that the provisions of the Federal Aviation Regulations, noted in our PMA letter of approval dated September 5, 2002, also apply to the enclosed PMA Listing-Supplement No. 2.  The enclosed Supplement should be retained with the original PMA Letter as evidence of approval to produce the parts concerned.

 

Sincerely,

 James S. Masciotra, PI

Seattle Manufacturing

  Inspection District Office

                                                                         NOT FOR REPRODUCTION

Enclosure:

  PMA Supplement No. 2

 FEDERAL AVIATION ADMINISTRATION - PARTS MANUFACTURER APPROVAL

 

------------------------------------------END OF LISTING----------------------------------------------

 

NOTE:  Minor design changes (reference 14 CFR part 21 §§ 21.93 and 21.95) must be submitted in a manner as determined by the ACO.  Major design changes (reference 14 CFR part 21 §§ 21.93 and 21.97) to drawings and specifications are to be handled in the same manner as that for an original FAA-PMA.                                                                                                                                

___________________                                                                                  __ Signature on file ­___________

Wolf R. Caliebe, Manager                                                                                   Dorr M. Anderson, Manager

Seattle Manufacturing                                                                                                 Seattle Aircraft Certification Office

   Inspection District Office     

 

Back to Door-Seal 

              Additional  Info       

 

 

 

Hit Counter

 

 

FAA-PMA-Approval Dec 15 2004

u.s. Department of Transportation

Federal Aviation Administration

Transport Airplane Directorate Aircraft Certification Service

1601 Lind Avenue S.w. Renton, Washington 98055-4056

DEC I 5 2004

In Reply

Refer To: 150S-04-508

Mr. Michael Peter AvTek Co:25230 45th Ave S. Kent, W A 98032

Dear Mr. Peter:

This is in response to your letter, dated November 25,2004, requesting Parts Manufacturer Approval (PMA) on AvTek door-seal part number Aero-PMA 1001, which is eligible for installation on the Piper Aircraft Models PA-22, PA-23, PA-24, PA-28, PA-30, and PA-32.

We have reviewed the drawings and data submitted and find they meet the requirements of 14 Code of Federal Regulations 21.303(d)(1). The approval of the design via the PMA supplement along with your application has been forwarded to the Seattle Manufacturing Inspection District Office (MIDO). Production approval will be granted after the validation of your fabrication inspection system, and issuance of the FAA-PMA letter and PMA supplement by the MIDO.

Sincerely,

Dor M Anderson

For Jeffrey E. Duven                                                                            NOT FOR REPRODUCTION

Manager, Seattle Aircraft Certification Office

December 27, 2004

 Mr. Mike Peter

AvTek

25230 45th Ave S

Kent, WA  98032

 

Dear Mr. Peter:

 

FEDERAL AVIATION ADMINISTRATION - PARTS MANUFACTURER APPROVAL

In accordance with the provisions of Title 14 of the Code of Federal Regulations (CFRs) part 21,

Subpart K, we have found that the design data, submitted by Avtek based on Test & Computations, and application letter dated December 23, 2004, meet the airworthiness requirements of the regulations applicable to the products on which the parts are to be installed.  Additionally, it has been determined that Avtek has established the fabrication inspection system required by part 21 § 21.303(h) at 25230 45th Ave S Kent, WA  98032.  Accordingly, Parts Manufacturer Approval (PMA) is hereby granted for production of the replacement parts listed in the enclosed Supplement No. 2.

 You are reminded that the provisions of the Federal Aviation Regulations, noted in our PMA letter of approval dated September 5, 2002, also apply to the enclosed PMA Listing-Supplement No. 2.  The enclosed Supplement should be retained with the original PMA Letter as evidence of approval to produce the parts concerned.

 

Sincerely,

 James S. Masciotra, PI

Seattle Manufacturing

  Inspection District Office

 

Enclosure:

  PMA Supplement No. 2

 FEDERAL AVIATION ADMINISTRATION - PARTS MANUFACTURER APPROVAL

 

------------------------------------------END OF LISTING----------------------------------------------

 

NOTE:  Minor design changes (reference 14 CFR part 21 §§ 21.93 and 21.95) must be submitted in a manner as determined by the ACO.  Major design changes (reference 14 CFR part 21 §§ 21.93 and 21.97) to drawings and specifications are to be handled in the same manner as that for an original FAA-PMA.                                                                                                                                

___________________                                                                                  __ Signature on file ­___________

Wolf R. Caliebe, Manager                                                                                   Dorr M. Anderson, Manager

Seattle Manufacturing                                                                                                 Seattle Aircraft Certification Office

   Inspection District Office     

 

Back to Door-Seal 

                

 

 

 